About 20 hours ago
false
Tokens: 2385/112
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
2 days ago
false
Tokens: 2383/101
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Screenshot
3 days ago
false
Tokens: 2383/96
Free
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
4 days ago
false
Tokens: 2383/112
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction activities are almost finished, the trail is not yet fully open to the public. Screenshot
5 days ago
false
Tokens: 2385/114
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, the trail is not fully open as of the latest update. Screenshot
6 days ago
false
Tokens: 2384/101
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Screenshot
6 days ago
false
Tokens: 2409/96
Free
The webpage and the provided text do not contain any updates confirming that the trail is fully open. The most recent update from May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of critical safety features is complete. Therefore, based on the available information, the trail is not yet fully open. Screenshot
7 days ago
false
Tokens: 2383/130
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the contractor will be installing fencing, railing, signage, and trail markings over the next few weeks. It explicitly mentions that the trail will not be opened for public use until all installations are complete. Therefore, as of the latest update, the construction is not yet fully complete, and the trail is not fully open. Screenshot
8 days ago
false
Tokens: 2385/109
Free
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
9 days ago
false
Tokens: 2385/111
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
10 days ago
false
Tokens: 2384/101
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Screenshot
11 days ago
false
Tokens: 2384/117
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, construction is not yet fully complete, and the trail is not fully open. Screenshot
12 days ago
false
Tokens: 2384/126
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, as of the information provided, the construction is not fully complete, and the trail is not yet fully open. Screenshot
13 days ago
false
Tokens: 2384/101
Free
The webpage and the provided text indicate that the St Vrain Trail Extension project is still under construction. The most recent update on May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. Therefore, the trail is not yet fully open to the public. Screenshot
13 days ago
false
Tokens: 2385/111
Free
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
14 days ago
false
Tokens: 2451/110
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is almost finished, the trail is not yet fully open to the public. Screenshot
14 days ago
false
Tokens: 2383/105
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update, dated May 28, 2025, states that construction is nearing completion but the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
14 days ago
false
Tokens: 2383/110
Free
The webpage provides updates on the construction of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
15 days ago
false
Tokens: 2385/108
Free
The webpage and the provided text indicate that the St Vrain Trail Extension project is expected to be completed at the end of July 2025. The most recent update on May 28, 2025, states that construction is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Screenshot
15 days ago
false
Tokens: 2384/91
Free
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
15 days ago
false
Tokens: 2385/111
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
16 days ago
false
Tokens: 2383/132
Free
The webpage provides updates on the construction of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail is not yet open to the public. The update mentions that critical safety features such as fencing, railing, signage, and trail markings are still being installed. Previous updates indicate that various sections of the trail and related structures (like bridges and culverts) are nearing completion or have been completed, but the trail remains closed until all safety features are installed. Screenshot
16 days ago
false
Tokens: 2385/112
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
16 days ago
false
Tokens: 2383/117
Free
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion and that over the next few weeks, the contractor will install fencing, railing, signage, and trail markings. It explicitly mentions that the trail will not be opened for public use until installation of these critical safety features is complete. Therefore, as of the last update, construction is not yet fully complete, and the trail is not fully open. Screenshot
17 days ago
false
Tokens: 2382/89
Free
The latest update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
17 days ago
false
Tokens: 2386/106
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update from May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
17 days ago
false
Tokens: 2383/104
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
18 days ago
false
Tokens: 2383/124
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, as of the information provided, the construction is not yet fully complete, and the trail is not fully open. Screenshot
18 days ago
false
Tokens: 2383/107
Free
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
18 days ago
false
Tokens: 2383/95
Free
The text indicates that as of May 28, 2025, construction of the trail is nearing completion. However, it specifically states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
19 days ago
false
Tokens: 2385/112
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
19 days ago
false
Tokens: 2210/120
Free
The webpage and the provided `body.innerText` indicate that the construction of the St Vrain Trail Extension is not yet complete. The most recent update on May 28, 2025, states that construction is nearing completion but that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, the trail is not fully open as of the latest update. Screenshot
19 days ago
false
Tokens: 2212/118
Free
The webpage and the provided body.innerText indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, it can be concluded that construction is not yet fully complete and the trail is not fully open. Screenshot
20 days ago
false
Tokens: 2211/100
Free
The webpage and the provided text indicate that construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Screenshot
20 days ago
false
Tokens: 2210/115
Free
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
20 days ago
false
Tokens: 2211/104
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Screenshot
21 days ago
false
Tokens: 2212/124
Free
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, based on the information provided, construction is not yet complete, and the trail is not fully open. Screenshot
21 days ago
false
Tokens: 2212/116
Free
The webpage and the provided body.innerText contain updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail is not yet open to the public. The update mentions that critical safety features such as fencing, railing, signage, and trail markings are still being installed. Therefore, the construction is not fully complete, and the trail is not fully open. Screenshot
21 days ago
false
Tokens: 2210/109
Free
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
22 days ago
false
Tokens: 2211/127
Free
The webpage and the body.innerText provide updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. It mentions that over the next few weeks, the contractor will install fencing, railing, signage, and trail markings. It explicitly states that the trail will not be opened for public use until these installations are complete. Therefore, based on this information, construction is not yet fully complete, and the trail is not fully open. Screenshot
22 days ago
false
Tokens: 2212/114
Free
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
22 days ago
false
Tokens: 2211/101
Free
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update from May 28, 2025, states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public. Screenshot
About 2 months ago
false
Tokens: 2579/67
Free
The screenshot mentions that the project is "expected to be completed at the end of July 2025" and describes the scope of the future work, implying that construction is not yet complete. There is no indication that the trail is fully open; it is stated as a project in progress with a planned completion date. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/70
Free
The webpage description states that the project is "expected to be completed at the end of July 2025." Since there is no mention of the construction being finished or the trail being fully open, and the completion date has not yet passed, it indicates that construction may not yet be complete and the trail may not be fully open. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/68
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Also, there is no mention that the trail is fully open or accessible. Therefore, it is likely that the construction is still ongoing and the trail is not fully open. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/89
Free
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025" and describes the project details. There is no indication in the text that construction is complete or that the trail is fully open. The use of the phrase "Loading" suggests the project status is still in progress. Therefore, the construction is not complete, and the trail is not fully open. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/65
Free
The webpage indicates that the project, including the trail extension, is scheduled to be completed by the end of July 2025. Since it is currently before that date and no mention of completion or opening is made, it is likely the construction is not yet complete and the trail is not fully open. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/47
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," suggesting that construction is ongoing and not yet complete. Therefore, the trail is not fully open at this time. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/61
Free
The project description states that the trail is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention that the trail is fully open or accessible at this stage. Therefore, the trail is not fully open. Determination: false Screenshot
About 2 months ago
false
Tokens: 2579/48
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the project is still underway, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/56
Free
The webpage indicates that the "St Vrain Trail Extension" project is "expected to be completed at the end of July 2025." Since this date is in the future, the construction is not yet complete, and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/77
Free
The project description states that the construction is "expected to be completed at the end of July 2025," indicating that, as of now, the construction is not yet complete. The description does not mention the trail being fully open, only the scope of the ongoing or planned work. Therefore, the trail is not fully open yet, and construction is not complete. Determination: false Screenshot
2 months ago
false
Tokens: 2579/51
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the trail's construction is still underway, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/53
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the trail extension is still under construction and not finished, it is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/49
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," suggesting that construction is not yet finished. Since the project is still in progress, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/80
Free
The webpage describes the project as "expected to be completed at the end of July 2025" and provides details about the construction scope. It does not state that construction is complete or that the trail is fully open; it only mentions ongoing work and the anticipated completion date. Therefore, based on the information, the construction is not yet complete, nor is the trail fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/64
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible. Therefore, the construction is not complete and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/60
Free
The webpage discusses a project expected to be completed by the end of July 2025, indicating that construction is ongoing and not yet finished. There is no mention of the trail being fully open, and since the project isn't complete, the trail is likely not fully open either. Determination: false Screenshot
2 months ago
false
Tokens: 2579/57
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which suggests that the construction is still ongoing and not yet complete. There is no indication that the trail is fully open, as the project is still in progress. Determination: false Screenshot
2 months ago
false
Tokens: 2579/56
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no indication that the trail is fully open; it is described as an extension project still in progress. Determination: false Screenshot
2 months ago
false
Tokens: 2579/40
Free
The webpage states the project is "expected to be completed at the end of July 2025," indicating construction is not yet complete. Therefore, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/61
Free
The webpage describes a project that is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention that the trail is fully open or accessible to the public. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2579/57
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates construction is ongoing and not yet finished. There is no mention of the trail being open or completed. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2579/45
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2579/70
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being open or fully accessible, only the planned scope of the project. Therefore, the trail is not fully open, and construction is not complete. Determination: false Screenshot
2 months ago
false
Tokens: 2579/53
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which means the construction is not yet complete. Since the trail's construction is ongoing and not finished, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2579/70
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which implies that construction is not yet complete. There is no mention that the trail is fully open or accessible; it only describes the planned high-level scope of the project. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2579/71
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention that the trail is fully open or accessible to the public, only that the project scope includes building the trail. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2579/56
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that the construction is not yet complete. Since the trail extension is not finished, it is unlikely that the trail is fully open at this time. Determination: false Screenshot
2 months ago
false
Tokens: 2579/48
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. Since the project is ongoing, the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2594/71
Free
The construction update states that the project is "expected to be completed at the end of July 2025," which suggests the project is not yet complete. No mention is made of the trail being fully open, only that the project is ongoing and will be completed in the future. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/57
Free
The construction update for the St Vrain Trail Extension states that the project is "expected to be completed at the end of July 2025." Since this date is in the future, the construction is not yet complete, and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/78
Free
The construction update indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible yet; it only describes ongoing construction work and the scope of the project. Therefore, the trail is not fully open, and construction is not complete. Determination: false Screenshot
2 months ago
false
Tokens: 2595/73
Free
The project description states that the trail extension is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible at this time. Therefore, based on the current update, the construction is still ongoing and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/67
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work. There is no indication in the construction updates that the project has been completed or that the trail is fully open. It appears to be ongoing with an upcoming completion date. Determination: false Screenshot
2 months ago
false
Tokens: 2595/69
Free
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025," which suggests it is not yet finished. There is no mention of the trail being open or fully accessible yet. Based on the construction update, the trail is still under construction and not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/53
Free
The project description states that the trail extension is "expected to be completed at the end of July 2025." There is no mention of construction being completed or the trail being fully open yet. The current status suggests that construction is still ongoing. Determination: false Screenshot
2 months ago
false
Tokens: 2595/60
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible in the update. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/65
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates the construction is still ongoing and not yet complete. There is no mention of the project being finished or open to the public as of now. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/64
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," which indicates it is not yet finished. There is no mention of the trail being open or fully accessible, only the scope of construction work. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/57
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet finished. There is no information stating that the trail is fully open; instead, the details suggest ongoing work and future completion. Determination: false Screenshot
2 months ago
false
Tokens: 2595/65
Free
The webpage provides a general project description indicating that the project is expected to be completed by the end of July 2025. There is no specific update or note indicating that construction is completed or that the trail is fully open. Therefore, based on this information, the trail is likely not yet fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/72
Free
The construction updates indicate that the project is expected to be completed at the end of July 2025, which means it is not yet finished. There is no mention that the trail extension is currently open or fully accessible; it only describes the scope of the project and its expected completion date. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/56
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," which indicates the construction is not yet complete. There is no indication that the trail is fully open, only that the project is ongoing and near completion. Determination: false Screenshot
2 months ago
false
Tokens: 2595/63
Free
The project description indicates that the trail extension is "expected to be completed at the end of July 2025." Since this date is in the future and there is no mention of current construction activity or delays, it suggests that construction is not yet complete and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/78
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work. There is no mention of current construction being ongoing or any delays, nor does it state that the trail is open. Based on this, the construction does not appear to be complete yet, and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/55
Free
The project status indicates that the construction is ongoing with an expected completion date at the end of July 2025. There are no recent updates or signs of completion mentioned; the project is still under construction. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/85
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," but it does not state that construction is finished or the trail is fully open. It only provides the scope of work and the expected completion date, not confirmation of completion or open status. Therefore, based on the available information, the construction is not yet complete, and the trail is not fully open. Determination: false Screenshot
2 months ago
false
Tokens: 2595/68
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no update or statement indicating that the trail is fully open; it only discusses ongoing construction work and project scope. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/62
Free
The construction update mentions that the project is "expected to be completed at the end of July 2025," which indicates that the construction is not yet complete. There is no mention of the trail being fully open or any completion milestones reached. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/75
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet complete. There is no updated status or indication that the trail is fully open; the focus is on the scope of work and the expected completion date. Therefore, the trail is not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/64
Free
The construction update states that the project is "expected to be completed at the end of July 2025." There is no mention of current completion, milestones achieved, or that the trail is open. This indicates that construction is not yet complete. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
2 months ago
false
Tokens: 2595/70
Free
The construction updates indicate that the project is still in progress with ongoing work on concrete trails, crusher fines, concrete box culverts, steel bridge, and fencing. The project is expected to be completed by the end of July 2025, but there is no mention of the construction being finished or the trail being fully open currently. Determination: false Screenshot
2 months ago
false
Tokens: 2595/63
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future. There is no indication that construction has been completed or that the trail is fully open. The project is still ongoing, with work expected to finish soon. Determination: false Screenshot
2 months ago
false
Tokens: 2595/76
Free
The construction updates indicate that the project is expected to be completed at the end of July 2025, but there is no mention of current completion or trail opening status. The description focuses on the scope of work rather than current progress or whether the trail is open. Therefore, based on the provided information, the trail does not appear to be fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/71
Free
The construction update mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention of the trail being fully open, only that the project is still underway and the scope includes various construction elements. Thus, the trail is likely not fully open yet. Determination: false Screenshot
3 months ago
true
Tokens: 2595/73
Free
The construction update indicates that the project is "expected to be completed at the end of July 2025." There is no mention of current construction activity, delays, or any indication that construction is ongoing or incomplete. The language suggests that the project is on schedule or nearing completion, and the trail is likely open or soon to be open. Determination: true Screenshot
3 months ago
false
Tokens: 2595/78
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," but there is no specific update indicating the construction is complete or the trail is fully open. The description focuses on planned features and scope rather than current status. Based on this, it appears the construction is not yet complete, and the trail is not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/69
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025" and describes the scope of work planned. There is no mention of current construction status, delays, or that the trail is open. The language suggests the project is still in progress and not yet completed or open for use. Determination: false Screenshot
3 months ago
false
Tokens: 2595/65
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future relative to the current date. There is no indication that construction is already complete or that the trail is fully open. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/59
Free
The construction updates specify that the project is "expected to be completed at the end of July 2025," which indicates ongoing construction activity. There are no updates stating that construction is finished or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/48
Free
The construction updates indicate that the project is still in progress, with planned completion by the end of July 2025. There is no mention of the project being completed or the trail being fully open at this time. Determination: false Screenshot
3 months ago
false
Tokens: 2595/55
Free
The webpage describes the project as "expected to be completed at the end of July 2025," which indicates that the construction is not yet finished. There are no updates or status indicators suggesting that construction is complete or that the trail is fully open. Determination: false Screenshot
3 months ago
true
Tokens: 2595/58
Free
The construction updates mention that the project is expected to be completed by the end of July 2025. There are no indications that construction is currently ongoing or incomplete, and the description suggests the project is progressing towards completion. Therefore, the trail should be fully open now. Determination: true Screenshot
3 months ago
false
Tokens: 2595/57
Free
The construction update states that the project is "expected to be completed at the end of July 2025," which indicates that the construction is not yet finished. Since the trail extension is still under construction and not yet complete, the trail is not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/87
Free
The webpage indicates that the St Trvain Trail Extension project is "expected to be completed at the end of July 2025," which suggests it is still under construction and not yet fully open. The description of the project focuses on the planned features and construction timeline, with no mention of the project being completed or the trail being open. Therefore, based on this update, the trail is not fully open yet. Determination: false Screenshot
3 months ago
true
Tokens: 2595/70
Free
The webpage states that the project is "expected to be completed at the end of July 2025" and describes the scope of work but does not mention any ongoing construction or delays. This implies that construction is complete and the trail is fully open, as the project is anticipated to be finished soon and no current issues are noted. Determination: true Screenshot
3 months ago
false
Tokens: 2595/66
Free
The construction update states that the project is "expected to be completed at the end of July 2025," which suggests that the work is not yet finished. There is no mention of the project being complete or the trail being fully open. Therefore, the trail is likely still under construction and not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/44
Free
The construction updates indicate that the project is still ongoing, with an expected completion date at the end of July 2025. There is no mention of current completion or the trail being fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/69
Free
The project description indicates that the construction is ongoing, with an expected completion date at the end of July 2025. There is no mention of the construction being finished or the trail being fully open, only that the project is planned to be completed by a future date. Therefore, the trail is not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/60
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet finished. There is no mention of the trail being open or fully accessible at this time. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/66
Free
The webpage provides a project description stating the project is "expected to be completed at the end of July 2025." There is no mention of current construction status, ongoing work, or delays, which suggests the project is likely still under construction and not yet complete. The trail is therefore not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/70
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," but it does not specify that construction is complete or that the trail is fully open. Since it is still in the planning or construction phase with an upcoming completion date, it indicates that the trail is likely not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/69
Free
The project description states that the construction is "expected to be completed at the end of July 2025," which indicates that the construction is not yet complete. There are no updates or indications that the trail is fully open, and the project scope seems to be ongoing. Therefore, the trail likely is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/58
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," and there is no indication in the construction updates that the project has been completed or that the trail is fully open. The description suggests ongoing work, not completion. Determination: false Screenshot
3 months ago
false
Tokens: 2595/75
Free
The construction update indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible yet; it only discusses the scope of the work and the anticipated completion date. Therefore, the trail is not fully open at this time. Determination: false Screenshot
3 months ago
false
Tokens: 2595/60
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates ongoing construction. There are no updates or notices indicating that construction is complete or that the trail is fully open. Therefore, the trail is likely not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/86
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future, and there is no indication that construction is currently finished or that the trail is fully open. The description focuses on the scope of the project rather than its completion status. Therefore, it cannot be confirmed that construction is complete or that the trail is fully open at this time. Determination: false Screenshot
3 months ago
false
Tokens: 2595/59
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025." There are no recent updates or indications that construction has been completed or that the trail is fully open. The project timeline suggests it is still under construction and not yet finished. Determination: false Screenshot
3 months ago
false
Tokens: 2595/64
Free
The project description states that construction is expected to be completed by the end of July 2025, and there are no updates indicating that construction is complete or that the trail is fully open. The project details focus on ongoing construction work and planned features, which suggests that construction is still in progress. Determination: false Screenshot
3 months ago
false
Tokens: 2595/60
Free
The construction update states that the project is "expected to be completed at the end of July 2025," which is in the future, and does not mention that the project has been completed or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/68
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible at this time, only the scope of the upcoming work. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/60
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which is in the future. There are no current construction updates indicating that construction is complete or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/67
Free
The project description states that the trail extension is "expected to be completed at the end of July 2025." Since the current date is not provided but the completion date is in the future, this indicates that the construction is not yet finished. There is no mention of the trail being open or fully accessible currently. Determination: false Screenshot
3 months ago
false
Tokens: 2595/65
Free
The construction update mentions that the project is "expected to be completed at the end of July 2025," which indicates it is still underway. There is no mention of the project being finished or open to the public yet, only the anticipated completion date. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/61
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025" and describes the scope of work, but there is no indication that construction has been completed or that the trail is fully open. It appears to be in progress but not yet finished. Determination: false Screenshot
3 months ago
true
Tokens: 2595/57
Free
The construction updates indicate that the project is expected to be completed by the end of July 2025, and there is no mention of current construction activity or delays. This suggests that construction is likely complete or near completion, and the trail should be fully open now. Determination: true Screenshot
3 months ago
false
Tokens: 2595/63
Free
The construction updates mention that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no information stating that the trail is fully open; the project is still in progress. Therefore, the trail is not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/66
Free
The webpage's construction update states that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet finished. There is no mention of the trail being fully open or accessible at this time. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/67
Free
The project description states that the trail extension is "expected to be completed at the end of July 2025," which indicates it is not yet finished. There are no recent construction updates or signs of ongoing construction activity mentioned that would suggest immediate completion or full opening. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/72
Free
The project description states that the construction is "expected to be completed at the end of July 2025." Since today is well before that date, construction is not yet complete. There is no indication in the updates that the trail is fully open; it is still under construction and development. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/57
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet finished. There are no updates or notices suggesting that the trail is fully open or that construction has been completed. Determination: false Screenshot
3 months ago
false
Tokens: 2595/110
Free
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025." It also mentions that the project is still in construction with details about ongoing work (concrete trail, crusher fine trail, culverts, steel bridge, fencing). There is no mention that construction is complete or that the trail is fully open; it only states the anticipated completion date. Therefore, based on the current information, the construction is not yet complete, and the trail is not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/67
Free
The construction updates specify that the project is "expected to be completed at the end of July 2025." Since today's date is earlier than that and there are no indications that construction has been completed or that the trail is fully open, it suggests that construction is not yet complete and the trail is not fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/63
Free
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention of the trail being open or fully accessible, only the planned scope and timeline. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/64
Free
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There are no updates or notes indicating the trail is fully open, only the planned scope of work. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/62
Free
The project is described as "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully operational, only the planned scope of work. Therefore, the trail is not fully open yet. Determination: false Screenshot
3 months ago
false
Tokens: 2595/81
Free
The webpage indicates that the St Vrain Trail Extension project is expected to be completed at the end of July 2025, and it states "Construction of the trail is nearing completion." This suggests that the construction is close to being finished. Since the trail is "nearing completion" rather than explicitly completed or open, it implies that it is not yet fully open for use. Determination: false Screenshot
3 months ago
false
Tokens: 2595/64
Free
The webpage indicates that the construction of the trail is "nearing completion" as of May 28, 2025, and states that over the next few weeks the project will be completed. This suggests that construction is not fully finished yet, and the trail is not fully open at this time. Determination: false Screenshot
3 months ago
false
Tokens: 2595/65
Free
The project update states that the "construction of the trail is nearing completion" and emphasizes that the construction is close to finishing. This suggests that the trail is not fully open yet, but is very close to being complete. Based on this information, the trail is likely not fully open at this moment. Determination: false Screenshot
3 months ago
false
Tokens: 2595/79
Free
The webpage indicates that the construction of the trail is "nearing completion" as of May 28, 2025, and states that "over the next few weeks the construction of the trail is nearing completion." This suggests that the trail is not fully complete yet, but close to being finished. There is no mention of the trail being fully open or any completion confirmation. Determination: false Screenshot
3 months ago
false
Tokens: 2595/83
Free
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025," but there is no specific mention that construction is fully complete or that the trail is fully open. The update mentions that construction is "nearing completion," which suggests it is not entirely finished yet. Therefore, the trail is likely not fully open at this moment. Determination: false Screenshot
3 months ago
false
Tokens: 2595/71
Free
The project update states that the construction of the trail is "nearing completion" and that "over the next few weeks the construction is expected to be finished." This indicates that construction is not fully complete yet. Since the trail is not fully open and the project is still under construction, the trail is not fully open at this moment. Determination: false Screenshot
3 months ago
false
Tokens: 2595/100
Free
The project description indicates that the trail is expected to be completed by the end of July 2025, and it mentions that the construction of the trail is "nearing completion" as of May 28, 2025. This suggests that the construction is close to finished, but not fully complete yet, and the trail may not be fully open at this moment. Since the trail is still "nearing completion," it implies it is not yet fully open for public use. Determination: false Screenshot
3 months ago
false
Tokens: 2595/97
Free
The webpage indicates that the St Vrain Trail extension project is "expected to be completed at the end of July 2025" and describes ongoing construction activities such as concrete and crusher fine trails, culverts, a steel bridge, and fencing. There is no mention that construction is finished or that the trail is fully open; it only states the project is nearing completion, with an expected finish date in the future. Therefore, the trail is not yet fully open. Determination: false Screenshot
3 months ago
false
Tokens: 2595/74
Free
The webpage indicates that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work, but it does not specify that construction is finished or that the trail is fully open. The mention of "construction of the trail is nearing completion" suggests it is still in progress, not fully complete yet. Determination: false Screenshot
3 months ago
true
Tokens: 2582/73
Free
The project description indicates that the construction of the trail is nearing completion and is expected to be finished by the end of July 2025. Since the current date is past that estimated completion date and the update explicitly states that the construction is "nearing completion," it suggests that the trail construction is now complete and the trail is fully open. Determination: true Screenshot
About 20 hours ago
false
Tokens: 2385/112
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
2 days ago
false
Tokens: 2383/101
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete.
3 days ago
false
Tokens: 2383/96
Free
Screenshot
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
4 days ago
false
Tokens: 2383/112
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction activities are almost finished, the trail is not yet fully open to the public.
5 days ago
false
Tokens: 2385/114
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, the trail is not fully open as of the latest update.
6 days ago
false
Tokens: 2384/101
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete.
6 days ago
false
Tokens: 2409/96
Free
Screenshot
The webpage and the provided text do not contain any updates confirming that the trail is fully open. The most recent update from May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of critical safety features is complete. Therefore, based on the available information, the trail is not yet fully open.
7 days ago
false
Tokens: 2383/130
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the contractor will be installing fencing, railing, signage, and trail markings over the next few weeks. It explicitly mentions that the trail will not be opened for public use until all installations are complete. Therefore, as of the latest update, the construction is not yet fully complete, and the trail is not fully open.
8 days ago
false
Tokens: 2385/109
Free
Screenshot
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete.
9 days ago
false
Tokens: 2385/111
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
10 days ago
false
Tokens: 2384/101
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete.
11 days ago
false
Tokens: 2384/117
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, construction is not yet fully complete, and the trail is not fully open.
12 days ago
false
Tokens: 2384/126
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, as of the information provided, the construction is not fully complete, and the trail is not yet fully open.
13 days ago
false
Tokens: 2384/101
Free
Screenshot
The webpage and the provided text indicate that the St Vrain Trail Extension project is still under construction. The most recent update on May 28, 2025, states that construction is nearing completion but that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. Therefore, the trail is not yet fully open to the public.
13 days ago
false
Tokens: 2385/111
Free
Screenshot
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
14 days ago
false
Tokens: 2451/110
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is almost finished, the trail is not yet fully open to the public.
14 days ago
false
Tokens: 2383/105
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update, dated May 28, 2025, states that construction is nearing completion but the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
14 days ago
false
Tokens: 2383/110
Free
Screenshot
The webpage provides updates on the construction of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
15 days ago
false
Tokens: 2385/108
Free
Screenshot
The webpage and the provided text indicate that the St Vrain Trail Extension project is expected to be completed at the end of July 2025. The most recent update on May 28, 2025, states that construction is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete.
15 days ago
false
Tokens: 2384/91
Free
Screenshot
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete.
15 days ago
false
Tokens: 2385/111
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
16 days ago
false
Tokens: 2383/132
Free
Screenshot
The webpage provides updates on the construction of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail is not yet open to the public. The update mentions that critical safety features such as fencing, railing, signage, and trail markings are still being installed. Previous updates indicate that various sections of the trail and related structures (like bridges and culverts) are nearing completion or have been completed, but the trail remains closed until all safety features are installed.
16 days ago
false
Tokens: 2385/112
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
16 days ago
false
Tokens: 2383/117
Free
Screenshot
The most recent update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion and that over the next few weeks, the contractor will install fencing, railing, signage, and trail markings. It explicitly mentions that the trail will not be opened for public use until installation of these critical safety features is complete. Therefore, as of the last update, construction is not yet fully complete, and the trail is not fully open.
17 days ago
false
Tokens: 2382/89
Free
Screenshot
The latest update on the webpage is from May 28, 2025. It states that construction of the trail is nearing completion, but critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete.
17 days ago
false
Tokens: 2386/106
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update from May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete.
17 days ago
false
Tokens: 2383/104
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public.
18 days ago
false
Tokens: 2383/124
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete. Therefore, as of the information provided, the construction is not yet fully complete, and the trail is not fully open.
18 days ago
false
Tokens: 2383/107
Free
Screenshot
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete.
18 days ago
false
Tokens: 2383/95
Free
Screenshot
The text indicates that as of May 28, 2025, construction of the trail is nearing completion. However, it specifically states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public.
19 days ago
false
Tokens: 2385/112
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that construction is nearing completion and that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public.
19 days ago
false
Tokens: 2210/120
Free
Screenshot
The webpage and the provided `body.innerText` indicate that the construction of the St Vrain Trail Extension is not yet complete. The most recent update on May 28, 2025, states that construction is nearing completion but that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The update explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, the trail is not fully open as of the latest update.
19 days ago
false
Tokens: 2212/118
Free
Screenshot
The webpage and the provided body.innerText indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, it can be concluded that construction is not yet fully complete and the trail is not fully open.
20 days ago
false
Tokens: 2211/100
Free
Screenshot
The webpage and the provided text indicate that construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The trail will not be opened for public use until these installations are complete.
20 days ago
false
Tokens: 2210/115
Free
Screenshot
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
20 days ago
false
Tokens: 2211/104
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open to the public. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete.
21 days ago
false
Tokens: 2212/124
Free
Screenshot
The webpage and the provided text both indicate that the construction of the St Vrain Trail Extension is nearing completion but is not yet fully open. The most recent update on May 28, 2025, states that critical safety features such as fencing, railing, signage, and trail markings are still being installed. The text explicitly mentions that the trail will not be opened for public use until these installations are complete. Therefore, based on the information provided, construction is not yet complete, and the trail is not fully open.
21 days ago
false
Tokens: 2212/116
Free
Screenshot
The webpage and the provided body.innerText contain updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion but the trail is not yet open to the public. The update mentions that critical safety features such as fencing, railing, signage, and trail markings are still being installed. Therefore, the construction is not fully complete, and the trail is not fully open.
21 days ago
false
Tokens: 2210/109
Free
Screenshot
The webpage provides updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
22 days ago
false
Tokens: 2211/127
Free
Screenshot
The webpage and the body.innerText provide updates on the construction status of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. It mentions that over the next few weeks, the contractor will install fencing, railing, signage, and trail markings. It explicitly states that the trail will not be opened for public use until these installations are complete. Therefore, based on this information, construction is not yet fully complete, and the trail is not fully open.
22 days ago
false
Tokens: 2212/114
Free
Screenshot
The webpage and the body.innerText provide updates on the construction progress of the St Vrain Trail Extension. The most recent update is from May 28, 2025, which states that construction is nearing completion. However, it also mentions that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This indicates that while construction is nearly finished, the trail is not yet fully open to the public.
22 days ago
false
Tokens: 2211/101
Free
Screenshot
The webpage and the provided text indicate that the construction of the St Vrain Trail Extension is nearing completion. The most recent update from May 28, 2025, states that the trail will not be opened for public use until the installation of fencing, railing, signage, and trail markings is complete. This implies that while construction is nearly finished, the trail is not yet fully open to the public.
About 2 months ago
false
Tokens: 2579/67
Free
Screenshot
The screenshot mentions that the project is "expected to be completed at the end of July 2025" and describes the scope of the future work, implying that construction is not yet complete. There is no indication that the trail is fully open; it is stated as a project in progress with a planned completion date. Determination: false
About 2 months ago
false
Tokens: 2579/70
Free
Screenshot
The webpage description states that the project is "expected to be completed at the end of July 2025." Since there is no mention of the construction being finished or the trail being fully open, and the completion date has not yet passed, it indicates that construction may not yet be complete and the trail may not be fully open. Determination: false
About 2 months ago
false
Tokens: 2579/68
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Also, there is no mention that the trail is fully open or accessible. Therefore, it is likely that the construction is still ongoing and the trail is not fully open. Determination: false
About 2 months ago
false
Tokens: 2579/89
Free
Screenshot
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025" and describes the project details. There is no indication in the text that construction is complete or that the trail is fully open. The use of the phrase "Loading" suggests the project status is still in progress. Therefore, the construction is not complete, and the trail is not fully open. Determination: false
About 2 months ago
false
Tokens: 2579/65
Free
Screenshot
The webpage indicates that the project, including the trail extension, is scheduled to be completed by the end of July 2025. Since it is currently before that date and no mention of completion or opening is made, it is likely the construction is not yet complete and the trail is not fully open. Determination: false
About 2 months ago
false
Tokens: 2579/47
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," suggesting that construction is ongoing and not yet complete. Therefore, the trail is not fully open at this time. Determination: false
About 2 months ago
false
Tokens: 2579/61
Free
Screenshot
The project description states that the trail is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention that the trail is fully open or accessible at this stage. Therefore, the trail is not fully open. Determination: false
About 2 months ago
false
Tokens: 2579/48
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the project is still underway, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/56
Free
Screenshot
The webpage indicates that the "St Vrain Trail Extension" project is "expected to be completed at the end of July 2025." Since this date is in the future, the construction is not yet complete, and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/77
Free
Screenshot
The project description states that the construction is "expected to be completed at the end of July 2025," indicating that, as of now, the construction is not yet complete. The description does not mention the trail being fully open, only the scope of the ongoing or planned work. Therefore, the trail is not fully open yet, and construction is not complete. Determination: false
2 months ago
false
Tokens: 2579/51
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the trail's construction is still underway, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/53
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Since the trail extension is still under construction and not finished, it is not fully open. Determination: false
2 months ago
false
Tokens: 2579/49
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," suggesting that construction is not yet finished. Since the project is still in progress, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/80
Free
Screenshot
The webpage describes the project as "expected to be completed at the end of July 2025" and provides details about the construction scope. It does not state that construction is complete or that the trail is fully open; it only mentions ongoing work and the anticipated completion date. Therefore, based on the information, the construction is not yet complete, nor is the trail fully open. Determination: false
2 months ago
false
Tokens: 2579/64
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible. Therefore, the construction is not complete and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/60
Free
Screenshot
The webpage discusses a project expected to be completed by the end of July 2025, indicating that construction is ongoing and not yet finished. There is no mention of the trail being fully open, and since the project isn't complete, the trail is likely not fully open either. Determination: false
2 months ago
false
Tokens: 2579/57
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which suggests that the construction is still ongoing and not yet complete. There is no indication that the trail is fully open, as the project is still in progress. Determination: false
2 months ago
false
Tokens: 2579/56
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no indication that the trail is fully open; it is described as an extension project still in progress. Determination: false
2 months ago
false
Tokens: 2579/40
Free
Screenshot
The webpage states the project is "expected to be completed at the end of July 2025," indicating construction is not yet complete. Therefore, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/61
Free
Screenshot
The webpage describes a project that is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention that the trail is fully open or accessible to the public. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2579/57
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates construction is ongoing and not yet finished. There is no mention of the trail being open or completed. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2579/45
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2579/70
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being open or fully accessible, only the planned scope of the project. Therefore, the trail is not fully open, and construction is not complete. Determination: false
2 months ago
false
Tokens: 2579/53
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which means the construction is not yet complete. Since the trail's construction is ongoing and not finished, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2579/70
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which implies that construction is not yet complete. There is no mention that the trail is fully open or accessible; it only describes the planned high-level scope of the project. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2579/71
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention that the trail is fully open or accessible to the public, only that the project scope includes building the trail. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2579/56
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025," which suggests that the construction is not yet complete. Since the trail extension is not finished, it is unlikely that the trail is fully open at this time. Determination: false
2 months ago
false
Tokens: 2579/48
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. Since the project is ongoing, the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2594/71
Free
Screenshot
The construction update states that the project is "expected to be completed at the end of July 2025," which suggests the project is not yet complete. No mention is made of the trail being fully open, only that the project is ongoing and will be completed in the future. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/57
Free
Screenshot
The construction update for the St Vrain Trail Extension states that the project is "expected to be completed at the end of July 2025." Since this date is in the future, the construction is not yet complete, and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2595/78
Free
Screenshot
The construction update indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible yet; it only describes ongoing construction work and the scope of the project. Therefore, the trail is not fully open, and construction is not complete. Determination: false
2 months ago
false
Tokens: 2595/73
Free
Screenshot
The project description states that the trail extension is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible at this time. Therefore, based on the current update, the construction is still ongoing and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2595/67
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work. There is no indication in the construction updates that the project has been completed or that the trail is fully open. It appears to be ongoing with an upcoming completion date. Determination: false
2 months ago
false
Tokens: 2595/69
Free
Screenshot
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025," which suggests it is not yet finished. There is no mention of the trail being open or fully accessible yet. Based on the construction update, the trail is still under construction and not fully open. Determination: false
2 months ago
false
Tokens: 2595/53
Free
Screenshot
The project description states that the trail extension is "expected to be completed at the end of July 2025." There is no mention of construction being completed or the trail being fully open yet. The current status suggests that construction is still ongoing. Determination: false
2 months ago
false
Tokens: 2595/60
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible in the update. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/65
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates the construction is still ongoing and not yet complete. There is no mention of the project being finished or open to the public as of now. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/64
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," which indicates it is not yet finished. There is no mention of the trail being open or fully accessible, only the scope of construction work. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/57
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet finished. There is no information stating that the trail is fully open; instead, the details suggest ongoing work and future completion. Determination: false
2 months ago
false
Tokens: 2595/65
Free
Screenshot
The webpage provides a general project description indicating that the project is expected to be completed by the end of July 2025. There is no specific update or note indicating that construction is completed or that the trail is fully open. Therefore, based on this information, the trail is likely not yet fully open. Determination: false
2 months ago
false
Tokens: 2595/72
Free
Screenshot
The construction updates indicate that the project is expected to be completed at the end of July 2025, which means it is not yet finished. There is no mention that the trail extension is currently open or fully accessible; it only describes the scope of the project and its expected completion date. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/56
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," which indicates the construction is not yet complete. There is no indication that the trail is fully open, only that the project is ongoing and near completion. Determination: false
2 months ago
false
Tokens: 2595/63
Free
Screenshot
The project description indicates that the trail extension is "expected to be completed at the end of July 2025." Since this date is in the future and there is no mention of current construction activity or delays, it suggests that construction is not yet complete and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2595/78
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work. There is no mention of current construction being ongoing or any delays, nor does it state that the trail is open. Based on this, the construction does not appear to be complete yet, and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2595/55
Free
Screenshot
The project status indicates that the construction is ongoing with an expected completion date at the end of July 2025. There are no recent updates or signs of completion mentioned; the project is still under construction. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/85
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," but it does not state that construction is finished or the trail is fully open. It only provides the scope of work and the expected completion date, not confirmation of completion or open status. Therefore, based on the available information, the construction is not yet complete, and the trail is not fully open. Determination: false
2 months ago
false
Tokens: 2595/68
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no update or statement indicating that the trail is fully open; it only discusses ongoing construction work and project scope. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/62
Free
Screenshot
The construction update mentions that the project is "expected to be completed at the end of July 2025," which indicates that the construction is not yet complete. There is no mention of the trail being fully open or any completion milestones reached. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/75
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet complete. There is no updated status or indication that the trail is fully open; the focus is on the scope of work and the expected completion date. Therefore, the trail is not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/64
Free
Screenshot
The construction update states that the project is "expected to be completed at the end of July 2025." There is no mention of current completion, milestones achieved, or that the trail is open. This indicates that construction is not yet complete. Therefore, the trail is likely not fully open yet. Determination: false
2 months ago
false
Tokens: 2595/70
Free
Screenshot
The construction updates indicate that the project is still in progress with ongoing work on concrete trails, crusher fines, concrete box culverts, steel bridge, and fencing. The project is expected to be completed by the end of July 2025, but there is no mention of the construction being finished or the trail being fully open currently. Determination: false
2 months ago
false
Tokens: 2595/63
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future. There is no indication that construction has been completed or that the trail is fully open. The project is still ongoing, with work expected to finish soon. Determination: false
2 months ago
false
Tokens: 2595/76
Free
Screenshot
The construction updates indicate that the project is expected to be completed at the end of July 2025, but there is no mention of current completion or trail opening status. The description focuses on the scope of work rather than current progress or whether the trail is open. Therefore, based on the provided information, the trail does not appear to be fully open yet. Determination: false
3 months ago
false
Tokens: 2595/71
Free
Screenshot
The construction update mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention of the trail being fully open, only that the project is still underway and the scope includes various construction elements. Thus, the trail is likely not fully open yet. Determination: false
3 months ago
true
Tokens: 2595/73
Free
Screenshot
The construction update indicates that the project is "expected to be completed at the end of July 2025." There is no mention of current construction activity, delays, or any indication that construction is ongoing or incomplete. The language suggests that the project is on schedule or nearing completion, and the trail is likely open or soon to be open. Determination: true
3 months ago
false
Tokens: 2595/78
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," but there is no specific update indicating the construction is complete or the trail is fully open. The description focuses on planned features and scope rather than current status. Based on this, it appears the construction is not yet complete, and the trail is not fully open. Determination: false
3 months ago
false
Tokens: 2595/69
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025" and describes the scope of work planned. There is no mention of current construction status, delays, or that the trail is open. The language suggests the project is still in progress and not yet completed or open for use. Determination: false
3 months ago
false
Tokens: 2595/65
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future relative to the current date. There is no indication that construction is already complete or that the trail is fully open. Therefore, the trail is likely not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/59
Free
Screenshot
The construction updates specify that the project is "expected to be completed at the end of July 2025," which indicates ongoing construction activity. There are no updates stating that construction is finished or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/48
Free
Screenshot
The construction updates indicate that the project is still in progress, with planned completion by the end of July 2025. There is no mention of the project being completed or the trail being fully open at this time. Determination: false
3 months ago
false
Tokens: 2595/55
Free
Screenshot
The webpage describes the project as "expected to be completed at the end of July 2025," which indicates that the construction is not yet finished. There are no updates or status indicators suggesting that construction is complete or that the trail is fully open. Determination: false
3 months ago
true
Tokens: 2595/58
Free
Screenshot
The construction updates mention that the project is expected to be completed by the end of July 2025. There are no indications that construction is currently ongoing or incomplete, and the description suggests the project is progressing towards completion. Therefore, the trail should be fully open now. Determination: true
3 months ago
false
Tokens: 2595/57
Free
Screenshot
The construction update states that the project is "expected to be completed at the end of July 2025," which indicates that the construction is not yet finished. Since the trail extension is still under construction and not yet complete, the trail is not fully open. Determination: false
3 months ago
false
Tokens: 2595/87
Free
Screenshot
The webpage indicates that the St Trvain Trail Extension project is "expected to be completed at the end of July 2025," which suggests it is still under construction and not yet fully open. The description of the project focuses on the planned features and construction timeline, with no mention of the project being completed or the trail being open. Therefore, based on this update, the trail is not fully open yet. Determination: false
3 months ago
true
Tokens: 2595/70
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025" and describes the scope of work but does not mention any ongoing construction or delays. This implies that construction is complete and the trail is fully open, as the project is anticipated to be finished soon and no current issues are noted. Determination: true
3 months ago
false
Tokens: 2595/66
Free
Screenshot
The construction update states that the project is "expected to be completed at the end of July 2025," which suggests that the work is not yet finished. There is no mention of the project being complete or the trail being fully open. Therefore, the trail is likely still under construction and not fully open. Determination: false
3 months ago
false
Tokens: 2595/44
Free
Screenshot
The construction updates indicate that the project is still ongoing, with an expected completion date at the end of July 2025. There is no mention of current completion or the trail being fully open. Determination: false
3 months ago
false
Tokens: 2595/69
Free
Screenshot
The project description indicates that the construction is ongoing, with an expected completion date at the end of July 2025. There is no mention of the construction being finished or the trail being fully open, only that the project is planned to be completed by a future date. Therefore, the trail is not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/60
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet finished. There is no mention of the trail being open or fully accessible at this time. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/66
Free
Screenshot
The webpage provides a project description stating the project is "expected to be completed at the end of July 2025." There is no mention of current construction status, ongoing work, or delays, which suggests the project is likely still under construction and not yet complete. The trail is therefore not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/70
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," but it does not specify that construction is complete or that the trail is fully open. Since it is still in the planning or construction phase with an upcoming completion date, it indicates that the trail is likely not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/69
Free
Screenshot
The project description states that the construction is "expected to be completed at the end of July 2025," which indicates that the construction is not yet complete. There are no updates or indications that the trail is fully open, and the project scope seems to be ongoing. Therefore, the trail likely is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/58
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," and there is no indication in the construction updates that the project has been completed or that the trail is fully open. The description suggests ongoing work, not completion. Determination: false
3 months ago
false
Tokens: 2595/75
Free
Screenshot
The construction update indicates that the project is "expected to be completed at the end of July 2025," which suggests that construction is not yet complete. There is no mention of the trail being fully open or accessible yet; it only discusses the scope of the work and the anticipated completion date. Therefore, the trail is not fully open at this time. Determination: false
3 months ago
false
Tokens: 2595/60
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates ongoing construction. There are no updates or notices indicating that construction is complete or that the trail is fully open. Therefore, the trail is likely not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/86
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," which is in the future, and there is no indication that construction is currently finished or that the trail is fully open. The description focuses on the scope of the project rather than its completion status. Therefore, it cannot be confirmed that construction is complete or that the trail is fully open at this time. Determination: false
3 months ago
false
Tokens: 2595/59
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025." There are no recent updates or indications that construction has been completed or that the trail is fully open. The project timeline suggests it is still under construction and not yet finished. Determination: false
3 months ago
false
Tokens: 2595/64
Free
Screenshot
The project description states that construction is expected to be completed by the end of July 2025, and there are no updates indicating that construction is complete or that the trail is fully open. The project details focus on ongoing construction work and planned features, which suggests that construction is still in progress. Determination: false
3 months ago
false
Tokens: 2595/60
Free
Screenshot
The construction update states that the project is "expected to be completed at the end of July 2025," which is in the future, and does not mention that the project has been completed or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/68
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully accessible at this time, only the scope of the upcoming work. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/60
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which is in the future. There are no current construction updates indicating that construction is complete or that the trail is fully open. Therefore, the trail is not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/67
Free
Screenshot
The project description states that the trail extension is "expected to be completed at the end of July 2025." Since the current date is not provided but the completion date is in the future, this indicates that the construction is not yet finished. There is no mention of the trail being open or fully accessible currently. Determination: false
3 months ago
false
Tokens: 2595/65
Free
Screenshot
The construction update mentions that the project is "expected to be completed at the end of July 2025," which indicates it is still underway. There is no mention of the project being finished or open to the public yet, only the anticipated completion date. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/61
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025" and describes the scope of work, but there is no indication that construction has been completed or that the trail is fully open. It appears to be in progress but not yet finished. Determination: false
3 months ago
true
Tokens: 2595/57
Free
Screenshot
The construction updates indicate that the project is expected to be completed by the end of July 2025, and there is no mention of current construction activity or delays. This suggests that construction is likely complete or near completion, and the trail should be fully open now. Determination: true
3 months ago
false
Tokens: 2595/63
Free
Screenshot
The construction updates mention that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no information stating that the trail is fully open; the project is still in progress. Therefore, the trail is not fully open. Determination: false
3 months ago
false
Tokens: 2595/66
Free
Screenshot
The webpage's construction update states that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet finished. There is no mention of the trail being fully open or accessible at this time. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/67
Free
Screenshot
The project description states that the trail extension is "expected to be completed at the end of July 2025," which indicates it is not yet finished. There are no recent construction updates or signs of ongoing construction activity mentioned that would suggest immediate completion or full opening. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/72
Free
Screenshot
The project description states that the construction is "expected to be completed at the end of July 2025." Since today is well before that date, construction is not yet complete. There is no indication in the updates that the trail is fully open; it is still under construction and development. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/57
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is still ongoing and not yet finished. There are no updates or notices suggesting that the trail is fully open or that construction has been completed. Determination: false
3 months ago
false
Tokens: 2595/110
Free
Screenshot
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025." It also mentions that the project is still in construction with details about ongoing work (concrete trail, crusher fine trail, culverts, steel bridge, fencing). There is no mention that construction is complete or that the trail is fully open; it only states the anticipated completion date. Therefore, based on the current information, the construction is not yet complete, and the trail is not fully open. Determination: false
3 months ago
false
Tokens: 2595/67
Free
Screenshot
The construction updates specify that the project is "expected to be completed at the end of July 2025." Since today's date is earlier than that and there are no indications that construction has been completed or that the trail is fully open, it suggests that construction is not yet complete and the trail is not fully open. Determination: false
3 months ago
false
Tokens: 2595/63
Free
Screenshot
The webpage mentions that the project is "expected to be completed at the end of July 2025," indicating that construction is not yet complete. There is no mention of the trail being open or fully accessible, only the planned scope and timeline. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/64
Free
Screenshot
The webpage states that the project is "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There are no updates or notes indicating the trail is fully open, only the planned scope of work. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/62
Free
Screenshot
The project is described as "expected to be completed at the end of July 2025," which indicates that construction is not yet complete. There is no mention of the trail being open or fully operational, only the planned scope of work. Therefore, the trail is not fully open yet. Determination: false
3 months ago
false
Tokens: 2595/81
Free
Screenshot
The webpage indicates that the St Vrain Trail Extension project is expected to be completed at the end of July 2025, and it states "Construction of the trail is nearing completion." This suggests that the construction is close to being finished. Since the trail is "nearing completion" rather than explicitly completed or open, it implies that it is not yet fully open for use. Determination: false
3 months ago
false
Tokens: 2595/64
Free
Screenshot
The webpage indicates that the construction of the trail is "nearing completion" as of May 28, 2025, and states that over the next few weeks the project will be completed. This suggests that construction is not fully finished yet, and the trail is not fully open at this time. Determination: false
3 months ago
false
Tokens: 2595/65
Free
Screenshot
The project update states that the "construction of the trail is nearing completion" and emphasizes that the construction is close to finishing. This suggests that the trail is not fully open yet, but is very close to being complete. Based on this information, the trail is likely not fully open at this moment. Determination: false
3 months ago
false
Tokens: 2595/79
Free
Screenshot
The webpage indicates that the construction of the trail is "nearing completion" as of May 28, 2025, and states that "over the next few weeks the construction of the trail is nearing completion." This suggests that the trail is not fully complete yet, but close to being finished. There is no mention of the trail being fully open or any completion confirmation. Determination: false
3 months ago
false
Tokens: 2595/83
Free
Screenshot
The webpage indicates that the St Vrain Trail Extension project is "expected to be completed at the end of July 2025," but there is no specific mention that construction is fully complete or that the trail is fully open. The update mentions that construction is "nearing completion," which suggests it is not entirely finished yet. Therefore, the trail is likely not fully open at this moment. Determination: false
3 months ago
false
Tokens: 2595/71
Free
Screenshot
The project update states that the construction of the trail is "nearing completion" and that "over the next few weeks the construction is expected to be finished." This indicates that construction is not fully complete yet. Since the trail is not fully open and the project is still under construction, the trail is not fully open at this moment. Determination: false
3 months ago
false
Tokens: 2595/100
Free
Screenshot
The project description indicates that the trail is expected to be completed by the end of July 2025, and it mentions that the construction of the trail is "nearing completion" as of May 28, 2025. This suggests that the construction is close to finished, but not fully complete yet, and the trail may not be fully open at this moment. Since the trail is still "nearing completion," it implies it is not yet fully open for public use. Determination: false
3 months ago
false
Tokens: 2595/97
Free
Screenshot
The webpage indicates that the St Vrain Trail extension project is "expected to be completed at the end of July 2025" and describes ongoing construction activities such as concrete and crusher fine trails, culverts, a steel bridge, and fencing. There is no mention that construction is finished or that the trail is fully open; it only states the project is nearing completion, with an expected finish date in the future. Therefore, the trail is not yet fully open. Determination: false
3 months ago
false
Tokens: 2595/74
Free
Screenshot
The webpage indicates that the project is "expected to be completed at the end of July 2025" and provides a detailed scope of work, but it does not specify that construction is finished or that the trail is fully open. The mention of "construction of the trail is nearing completion" suggests it is still in progress, not fully complete yet. Determination: false
3 months ago
true
Tokens: 2582/73
Free
Screenshot
The project description indicates that the construction of the trail is nearing completion and is expected to be finished by the end of July 2025. Since the current date is past that estimated completion date and the update explicitly states that the construction is "nearing completion," it suggests that the trail construction is now complete and the trail is fully open. Determination: true